Canyon Crest Regional Stormwater Basin
WATER INFRASTRUCTURE PUBLIC WORKS
2024
Moreno Valley, California

Canyon Crest Regional Stormwater Basin

35 Acre-Feet Capacity — Executed under California Class A General Engineering licensure.

Project Overview & Engineering Scope

Mass excavation and slope stabilization for a municipal regional flood retention facility. Work included precision contour grading, spillway subgrades, and heavy riprap rock slope protection.

Key Engineering Deliverables

185,000 cubic yards engineered basin excavation
3:1 engineered slope contouring and bench stabilization
Heavy riprap placement and concrete discharge apron subgrades
Full compliance with regional Water Quality Control Board mandates

Geotechnical & Inspection Compliance

Continuous nuclear gauge density testing verified without deficiency. Strict 95%+ geotech compaction sign-offs.

Project Details

Client / Partner
County Flood Control District
Licensure Tier
California Class A General Engineering Licensure
Compaction Metric
100% Geotech Compliance Verified
Principal Involvement
Adam Reynolds & Kevin (RMO)
Back to all projects